翻訳と辞書 |
Upper Cisokan Pumped Storage Power Plant : ウィキペディア英語版 | Upper Cisokan Pumped Storage Power Plant
The Upper Cisokan Pumped Storage Plant will be located west of Bandung in West Java, Indonesia and will occupy area in West Bandung Regency and Cianjur Regency.〔(【引用サイトリンク】title=Pembangunan PLTA Cisokan Selesai 4 Tahun )〕 After receiving funding from the World Bank, construction on major works is expected to begin in 2015 and the first generator commissioned in 2019. It will have an installed capacity of 1,040 MW and will be Indonesia's first pumped-storage power plant. As a pumped-storage power plant, the project includes the creation of an upper and lower reservoir; the lower reservoir will be on the Upper Cisokan River a branch of Citarum River,〔(【引用サイトリンク】url=http://gfdrr.aiddata.org/project/show/2430660 )〕 while upper reservoir will be on the Cirumanis River, a branch of the Cisokan River. ==Background== Studies for the project were carried out in the 1990s and a detailed design was completed in 2002. A World Bank loan for the project was approved in May 2011 and signed in November. The West Java government approved the project in October 2011. Preliminary construction such as access road building began in early 2014. The first generator should operational by 2019. Of the project's US$800 million cost, US$640 million is being provided by the World Bank. The remaining US$160 million is to be supplied by the project owner Perusahaan Listrik Negara.〔(【引用サイトリンク】url=http://web.worldbank.org/external/projects/main?Projectid=P112158&theSitePK=40941&piPK=64302772&pagePK=64330670&menuPK=64282135&Type=Financial )〕
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Upper Cisokan Pumped Storage Power Plant」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|